Labor Depends on What's Already There
Running new line set and a condensate drain to a wall that has neither takes more time than tying into a stub that's already roughed in. Where the outdoor unit lands relative to the indoor head matters too. Every extra foot of line set is more refrigerant, more insulation, more wall to get through, and electrical can add its own cost if the breaker panel doesn't already have room for a dedicated circuit.







